The floor is down and I still wait for the gas fitter

The gas fitter that postponed me until after the long weekend did not show up on Wednesday as he agreed.
He didn't phone me either so not until Thursday did I give him a call and now he says this Monday.
I had arranged to set this laminate flooring this week but with the heat and setbacks I am setting the last of it today. A bit of quarter round and I'm done. This job is sure hard on my old knees and the crap I bought fits together when it wants and separates with too much pressure making the task a lot harder than it should be.
Next task is the siding and we are just about ready to move over some tools.